Solar Structures

A Leading Solar Structure Company

Management Challenges

To launch the Solar structure with competitive price Ensure that the target price of commodities is in line with the budgeted price Ease of Assembly time at onsite to reduce labor cost and other hidden cost Ensure Customer satisfaction with lower price at high durability

PCPL Approach

From the available CAD data and technical specifications, prepare the BOM. Develop the manufacturing process plan for each component based on the commodity – Pultrusion, Assembly, Hand Molding & fabrication Preparing the Should-Cost models for all individual components in the assembly. Generation of the assembly cost model.

Value Delivered

Identified savings (Cost and Weight) in product Overall 20 % cost reduction achieved as compared to base cost data Overall 46.48% mass reduction

Solar Stationary

Solar Structure

Inputs Provided

PCPL’s Solution :